Installation of the arm for the floating input to Los Molinos dam
On 3th December, the arm assembly operation for the floating input was carried out in the Los Molinos dam in Hornachos (Badajoz). This action has been carried out within the works that are being carried out in the association of municipalities of “Los Molinos” in order to guarantee the drinkability of the water to the approximately 60,000 persons of this region.
In addition to the project, Ambling provides technical assistance and coordination in matters of Health and Safety.